Energie / B2B Services · Case Study
Measured Result
+35%
Project execution speed
The CEO of a 40-person B2B energy services company came with an apparent problem: 'my team doesn't execute quickly.' A deeper analysis revealed: there were two Level 2 directors with overlapping authority in the operational area – Operations Director and Project Director. Every important operational decision generated an implicit power negotiation between them, consuming weeks before execution. The CEO had avoided clarifying authority for 8 months to avoid conflict.
I worked with the CEO on 3 simultaneous levels: (1) clarifying formal authority – a 2-page document with clear decision boundaries for each director; (2) a structured session with both directors to externalize the conflict and rebuild the shared protocol; (3) recalibrating the CEO regarding authority conflict – why it had been avoided and what cost that avoidance had produced.
At 6 weeks post-intervention: operational decisions that took 2-3 weeks were made in 3-4 days. Project execution speed increased by 35% (measured in days from approval to delivery). The CEO reported a significant reduction in time spent on internal 'arbitration'.
Other case studies
Construcții · Franța
Administrator in France: Stopping the Burnout Spiral and Reclaiming Personal Authority
Imobiliare / Tech
Real Estate Associate: Clarity Between Two Roles and Exiting Autopilot
FMCG / Lactate
National General Manager: Recalibrating Authority and Restructuring Team Relationships
Tech / SaaS
Tech Startup Founder: Two Pivots, 4 Weeks, One Exit Clause
Marketing / Consultanță
Strategic Marketer: From Confusion to Operational Roadmap in 3 Weeks
Arhitectură / Proiectare
Architect & E-commerce Co-founder: From Fear and Dependency to Owned Leadership in 6 Months
Confidențialitate & Cookie-uri
Folosim cookie-uri esențiale pentru funcționarea site-ului. Opțional, cookie-uri de analiză și marketing pentru a îmbunătăți experiența. Conform GDPR, consimțământul tău contează. Politica de confidențialitate